Yard selection, contract negotiation, daily in-person progress oversight, and post-docking assessment. Most drydock overruns are not accidents — they are the result of a scope that was not fixed firmly enough before work started. We fix the scope first.
The work that prevents a drydock from overrunning happens before the vessel arrives. Yard selection based on your specific vessel type and scope. Tender preparation that creates genuine competition between yards. Contract negotiation that locks the scope firmly enough that additional work items need written approval and a separate price.
Once the vessel is in dry dock, we are in the yard daily. Progress against the agreed scope. Verification that class-required work is completed to the surveyor's satisfaction before the vessel is undocked. Identification of any scope additions before they are charged — not after. Daily written reports back to the owner.
Post-docking, we do a final assessment of condition and sign-off documentation before departure. Where follow-up items exist, they are listed with responsibility allocated and timelines confirmed.
Yard selection & tender — based on vessel type, scope, and owner's timeline
Scope preparation — class items separated from owner's work
Contract negotiation — fixed scope, agreed price, variation control
Daily in-person oversight — superintendent present at yard throughout
Daily written progress report — to owner and class surveyor
Variation control — all additional work approved in writing before proceeding
Class coordination — survey attendance, condition close-out, certificate issue
Invoice verification — yard invoices checked against agreed scope before payment
Post-docking assessment — final condition report with open items
We prepare a detailed drydock specification document. Class-required items, owner-initiated work, and recommended items are listed separately with estimated costs.
Tender to 3–5 yards. Evaluation on price, availability, track record on similar vessels, and geographic convenience. Recommendation with supporting data.
Superintendent at yard every day. Progress tracked against the approved specification. All additional items captured and approved in writing before work proceeds.
Class survey completed and certificate issued. Invoice verified against contracted scope. Post-docking condition report issued. Vessel undocked and departed.
The most expensive drydock additions are the ones that were never in the specification. We define the scope precisely enough that anything added requires a separate written order.
Yards present additional work items as urgent class requirements. We know which items are class-mandated and which are recommendations. The difference can be hundreds of thousands of dollars.
Dry dock delays cost off-hire. We track progress daily against the agreed completion date and flag delays before they compound, not after the undocking date has already passed.
Yard invoices are checked line by line against the agreed scope and approved variations. Work that was not approved does not get paid — which requires the variation control to have been done correctly upstream.
We have worked with yards in Singapore, China, Turkey, UAE, and India. We know which yards perform and which yards need tighter contract language.
Survey coordination is handled by our team. We know when the surveyor needs to attend, what documentation is required, and what condition the work needs to be in before survey attendance is requested.
Turnkey repair means we take the vessel from the first defect survey, through the repair or upgrade, to delivery to you. One team, led by a Chief Engineer, stays with the job from start to finish. Class items are kept separate from the owner's items, so you can see what is required and what is optional.
How It WorksWe survey the vessel and write the condition survey and defect list. Each item is marked as class or statutory, or as the owner's choice.
We prepare the repair and upgrade scope and take quotes from yards or workshops. You get the scope and the quotes side by side before you commit.
Spares and materials are procured. A superintendent supervises the work in person every day, and changes are agreed in writing.
Testing and sea trials are carried out, class and flag documentation is completed, and the vessel is handed over to the owner or the buyer.
Many owners and buyers do not want to manage several yards, vendors and surveyors while the vessel is out of service. We run the repair for you, from the first survey to the day the vessel is delivered.
It suits an owner repairing or upgrading a vessel, and a buyer who wants a newly bought vessel put in order and delivered ready to trade. It follows on naturally from a pre-purchase inspection, because the defect list is already known.
Condition survey and defect list — what is wrong, and how urgent it is
Repair and upgrade scope — class items separated from the owner's items
Yard or workshop selection and tender — quotes compared on the same scope
Spares and materials procurement — ordered and tracked to the job
Daily in-person supervision — our superintendent at the vessel or yard
Testing, sea trials, class and flag documentation — completed before handover
Handover and delivery — to the owner or the buyer
We've sat on both sides of a drydock — as the engineer signing off the work, and now as the manager controlling the budget. That's the difference between a superintendent who reviews a quotation and one who knows which line items are padding.
A typical yard repair list often includes line items that are yard-preference, not class-requirement or safety-requirement. We separate the two before the contract is signed, with daily progress checked in person — not signed off remotely — so your vessel comes back on time and on budget.
Tell us the vessel, scope, and timeline. We can step in at specification stage, tender stage, or at the yard — whichever is most useful given where you are now.
Discuss your drydock →